Price it
Price it here, before you call anyone.
A few questions, a range in about a minute. The calculator uses the rates we quote with — a site visit pins the exact number.
Instant fence & deck estimate
01 / 09- Basics
- Style
- Site
- Photos
- Budget
Price it
A few questions, a range in about a minute. The calculator uses the rates we quote with — a site visit pins the exact number.
Instant fence & deck estimate
01 / 09Ontario

Markham's Cornell and Berczy Village were built to New Urbanist standards with rear laneways and detached garages, so the fence has to negotiate a garage wall, a laneway gate and a service corridor rather than simply running around a yard.
Markham's Cornell and Berczy Village were built to New Urbanist standards with rear laneways and detached garages, so the fence has to negotiate a garage wall, a laneway gate and a service corridor rather than simply running around a yard.
Markham's 338,503 residents work for a concentration of technology employers, IBM Canada and AMD Canada among them, that shaped how the newer neighbourhoods were planned. The street layout those planners chose is what makes fencing here unusual.
Markham runs a genuinely continental winter: -5.2°C on average and 130 cm of snow that stays powdery. Ground frost goes in early and comes out late, which makes footing depth the single decision that determines whether a fence and deck installation is still plumb in five years.
Footings go to 120 cm in Markham, below frost depth, because a post set shallow will lift the first spring after it is installed. Build season is April–November.
Markham scores 41, low by design. Wide driveways and real side yards across Thornhill, Cachet, Berczy Village and Cornell mean we can usually get equipment to the post line, which shortens the dig and keeps labour off the invoice.
IBM Canada, AMD Canada and Honda Canada are among the larger employers in Markham, and the housing stock is newer than the Toronto average, which usually means straighter lot lines and fewer surprises when we start digging.
What actually gets installed on Markham property lines skews toward composite decking, with aluminum picket, cedar and vinyl privacy fence close behind. That reflects what neighbours already have, and matching the street is usually worth more at resale than picking the premium option in isolation.
Anything structural on a fence and deck installation in Markham is reviewed by City of Markham Building Standards. We know what they ask for, we submit it, and we schedule around their inspection windows so the build does not stall waiting on a sign-off.
Most Markham properties have a side drive or a rear gate wide enough to wheel material in, so a job here usually lands in the lower part of the range above. Snowfall runs about 130 cm a year here, and that is what sets the railing and substructure spec rather than the fence rate. Footings go below the 120 cm frost line either way.
Final price confirmed on site
Changes priced in writing, never after the fact
We file the locate before we dig
Old material hauled away

Six or eight foot board-on-board or tongue-and-groove privacy fencing, built to the 2.0 m rear-yard limit that applies at your address.

Western red or eastern white cedar fencing that resists rot through its own heartwood oils, with 4x4 posts standard and a 6x6 upgrade.

Colour-through composite boards on an aluminum or steel frame, so the top line stays straight and nothing ever needs staining.

Privacy, semi-privacy and picket vinyl panels in white and almond that lock into routed posts and rinse clean with a garden hose.

Powder-coated aluminum picket fencing that racks to follow sloped grade and takes self-closing pool-enclosure gate hardware.

Galvanised or black vinyl-coated mesh in 4, 5 and 6 foot heights, with walk and double drive gates and effectively zero maintenance.

Walk and double drive gates with a diagonal brace from the bottom hinge to the top latch corner, so the frame cannot rack into a sag.

A straight answer on whether your fence is worth keeping, with the posts probed at grade — and a line-item price for the replacement when it is not.

Decks framed from footings below the 1.2 m frost line, in pressure-treated, cedar, composite or PVC, with permit drawings handled.

Capped composite deck boards from entry to premium tier, laid on hidden fasteners with an optional mitred picture-frame border.

PVC deck boards with no wood content at all, the coolest surface in their class underfoot and the answer for shaded damp decks.

Western red or eastern white cedar decking, cooler underfoot than composite, fastened with stainless or coated screws and sealed at the cuts.

Wood, aluminum or glass guards built to OBC 9.8.8 heights, priced per linear foot as their own line and retrofittable to an existing deck.

Stringers cut to your measured deck height so every riser is equal, with a graspable handrail on every flight and a proper landing pad.

An inspection that starts at the ledger and the footings, with a straight answer on repair versus rebuild before any money is spent.
