Price it
Price it here, before you call anyone.
A few questions, a range in about a minute. The calculator uses the rates we quote with — a site visit pins the exact number.
Instant fence & deck estimate
01 / 09- Basics
- Style
- Site
- Photos
- Budget
Price it
A few questions, a range in about a minute. The calculator uses the rates we quote with — a site visit pins the exact number.
Instant fence & deck estimate
01 / 09Ontario

The Niagara Escarpment splits Hamilton into two different jobs: below the mountain the lots are flat century-home yards with shale close to the surface, and above it the yards step down the slope, so a Stoney Creek or Ancaster deck is usually a multi-level build rather than a single platform.
The Niagara Escarpment splits Hamilton into two different jobs: below the mountain the lots are flat century-home yards with shale close to the surface, and above it the yards step down the slope, so a Stoney Creek or Ancaster deck is usually a multi-level build rather than a single platform.
Hamilton's 569,353 residents live on either side of a cliff. ArcelorMittal Dofasco and McMaster University sit in the lower city; much of the newer housing sits above it.
The Niagara Escarpment funnels weather over Hamilton and lifts annual snowfall to 160 cm, with winters near -4.2°C. Elevation change also means wind: exposed lots take gusts that a solid-board fence and deck installation has to be engineered against, not just fastened together.
Footings go to 120 cm in Hamilton, below frost depth, because a post set shallow will lift the first spring after it is installed. Build season is April–November.
Hamilton is a full market on its own. Hamilton Health Sciences, McMaster University and ArcelorMittal Dofasco are among the biggest local employers, and shift work at that scale shapes when we can get access to a backyard.
Permits and inspections for a fence and deck installation in Hamilton go through City of Hamilton Building Division, and we file them. Their review turnaround and their reading of the height and setback rules differ from the next municipality over, which is the main reason a local crew beats a general contractor driving in.
Hamilton yards run heavily to western red cedar. Pressure-treated pine, composite decking and chain link make up most of the rest of what we quote here, and the mix is stable enough that we stock for it.
At a walk score of 54, Hamilton mixes older tight-frontage streets with postwar lots. Ancaster, Westdale, Durand and Dundas cover most of what we build, and access ranges from a full driveway drop to a gate we have to take off its hinges.
Access splits street by street. The older blocks near the core are hand-carry and price toward the top of the range above; the subdivisions have a side drive and sit near the bottom. Which one applies to a given Hamilton property is settled on the site visit, not assumed. Snowfall runs about 160 cm a year here, and that is what sets the railing and substructure spec rather than the fence rate. Footings go below the 120 cm frost line either way.
Final price confirmed on site
Changes priced in writing, never after the fact
We file the locate before we dig
Old material hauled away

Six or eight foot board-on-board or tongue-and-groove privacy fencing, built to the 2.0 m rear-yard limit that applies at your address.

Western red or eastern white cedar fencing that resists rot through its own heartwood oils, with 4x4 posts standard and a 6x6 upgrade.

Colour-through composite boards on an aluminum or steel frame, so the top line stays straight and nothing ever needs staining.

Privacy, semi-privacy and picket vinyl panels in white and almond that lock into routed posts and rinse clean with a garden hose.

Powder-coated aluminum picket fencing that racks to follow sloped grade and takes self-closing pool-enclosure gate hardware.

Galvanised or black vinyl-coated mesh in 4, 5 and 6 foot heights, with walk and double drive gates and effectively zero maintenance.

Walk and double drive gates with a diagonal brace from the bottom hinge to the top latch corner, so the frame cannot rack into a sag.

A straight answer on whether your fence is worth keeping, with the posts probed at grade — and a line-item price for the replacement when it is not.

Decks framed from footings below the 1.2 m frost line, in pressure-treated, cedar, composite or PVC, with permit drawings handled.

Capped composite deck boards from entry to premium tier, laid on hidden fasteners with an optional mitred picture-frame border.

PVC deck boards with no wood content at all, the coolest surface in their class underfoot and the answer for shaded damp decks.

Western red or eastern white cedar decking, cooler underfoot than composite, fastened with stainless or coated screws and sealed at the cuts.

Wood, aluminum or glass guards built to OBC 9.8.8 heights, priced per linear foot as their own line and retrofittable to an existing deck.

Stringers cut to your measured deck height so every riser is equal, with a graspable handrail on every flight and a proper landing pad.

An inspection that starts at the ledger and the footings, with a straight answer on repair versus rebuild before any money is spent.
It changes the snow load more than the frost. Hamilton sits in the escarpment snowbelt and takes about 160 cm a year, the heaviest in our service area, on a winter mean near -4.2C. Drifting against a solid privacy panel puts a lateral load on the posts that a picket fence never sees, and above the escarpment in Ancaster and Dundas that load is worse than it is down in Westdale. Where a run has already racked, we brace it as part of the repair.
Yes, and piecemeal is usually the right answer on those lots. Pre-survey blocks in the lower city have lines that wander, so each bay gets measured and cut on site rather than dropped in as a stock panel. That is slower per foot than a new subdivision run and we quote it that way. Cedar and pressure-treated pine both take a scribed cut cleanly, which is part of why they stay the common repair material here.
More often than people assume. Chain link is still common on Hamilton property lines, and the failure is nearly always a bent terminal post or a stretched top rail rather than the fabric. Replacing the post and re-tensioning the run costs a fraction of new fence and lasts. When the fabric itself has rusted through at the bottom selvage, that section is finished and we will tell you plainly. Permits for either sit with the City of Hamilton Building Division and a same-height repair is exempt.
